Staff
Tolio Tullio
- Qualifica: Direttore
- Sede: Via Bassini 15, 20133 - Milano
- Tel: +39 02 2369 9995 - Fax: +39 02 2369 9941
Pubblicazioni
2009
- - A STEP-NC COMPLIANT SYSTEM FOR THE HAND LAY-UP PROCESS- A STOCHASTIC PROGRAMMING APPROACH TO DESIGN THE PRODUCTION SYSTEM FLEXIBILITY CONSIDERING THE EVOLUTION OF THE PART FAMILIES- MULTI-STAGE STOCHASTIC PROGRAMMING FOR MANUFACTURING SYSTEM DESIGN- PROGETTO NETWORK PART PROGRAM AT.1.2.1 - R1 - REPORT: REGOLE DI PRECEDENZA TECNOLOGICA TRA LE OPERAZIONI- PROGETTO NETWORK PART PROGRAM AT.1.2.3 - R3 - REPORT: STUDIO DI UN MOTORE INFERENZIALE PER LA RISOLUZIONE DELLE REGOLE DI PRECEDENZA TRA LE OPERAZIONI- PROGETTO NETWORK PART PROGRAM AT.1.2.6 - R3 - REPORT: DIMOSTRATORE DI UN MODULO DI RIMOZIONE DEI VINCOLI NON NECESSARI DA PP LINEARI- PROGETTO NETWORK PART PROGRAM AT.2.2.4 - R2 - REPORT: DIMOSTRATORE DI UN GENERATORE AUTOMATICO DEL NETPP DI UN CONFIGURAZIONE PALLET

